Chaphalkar Karandikar Developers

Project Features

We shaped elina living and the people made it their way of life. It didn’t stop there. More and more people wanted to choose the elina life. And so, we’re happy to present the next version of elina living. Elina lite is your second chance to own an urban lifestyle with fantastic indoors, outdoors and an amazing neighbourhood.

amenities

Enjoy a Perfect Blend of Convenience, Luxury, and Green Living with Our Premium Amenities.

Recreational Amenities

Terrace Amenities

Common Amenities

Energy Conservation Measures

Safety Measures

Specifications

Our thoughtfully crafted specifications ensure a blend of quality, comfort, and functionality. From premium materials to advanced features, every detail is designed to enhance your living experience. Discover homes built to meet the highest standards of excellence

Auto-Scroll Sections

Electrification

  • Concealed electrical wiring with branded switches sockets /sockets in all rooms.
  • Provision for telephone, DTH & broadband connectivity.
  • AC point provision in master bedroom.
  • Power point in toilets and kitchen.
  • Provision for inverter backup.

Doors

  • Main door laminated flush door 40mm thick with plywood/scantling frame with good quality hardware.
  • Bedroom doors laminated doors 32 mm thick with plywood/scantling frame with a cylindrical lock.

Kitchen

  • Granite top platform 24”broad.
  • Branded SS sink.
  • Dado-till lintel level -300mmX 600mm.
  • Provision for exhaust fan.

Plumbing

  • Washing machine provision in dry balcony.

Windows And Railings

  • 3 TRACK powder-coated aluminum sliding windows with mosquito net.
  • MS railing of 3’6 high for all terraces/balconies.
  • Extra large windows for better light & ventilation.

Flooring & Wall Finish

  • Branded 800x800mm vitrified tile flooring for all rooms & kitchen.
  • 300x600mm anti-skid ceramic tile flooring for toilet up to lintel level.
  • Terrace anti-skid flooring 600x600 mm.
  • Oil bound distemper for internal walls and ceiling; branded paint for external walls.
  • Gypsum punning on walls.
  • Internal brickwork and plaster.

Walkthrough

photo gallery

Location

Construction Updates

15th slab casting in
progress.
November-2024
Painting completed till 8th floor.
November-2024
Swimming pool slab casting.
November-2024

Testimonials

Want to know more?

Download the project brochure now!

Enquire Now

Drop us a message and well get back to you ASAP.





    Rera Registration No.: P52100035129